CN | EN | ESP

Industrial Engineering

China United Engineering Company, formerly known as the second Design Institute of mechanical industry, is one of the first large-scale comprehensive design institute of the new China, the country to undertake various types of machinery factory design and technical transformation tasks. In 1958, according to the division of the national industry, mainly responsible for power generation equipment manufacturing industry (boiler, steam turbine, power station auxiliary), general equipment manufacturing industry (fan, compressor, pump, valve, cooling machine, air separation equipment, vacuum equipment, separation equipment, plastic machinery, etc.) design and development planning, basic construction and technical transformation projects and instrument manufacturing industry, and undertake the design task related to the production of special equipment, automatic line test device, making contribution to the establishment of the system of China's machinery industry.


  China United Engineering Company, formerly known as the second Design Institute of mechanical industry, is one of the first large-scale comprehensive design institute of the new China, the country to undertake various types of machinery factory design and technical transformation tasks. In 1958, according to the division of the national industry, mainly responsible for power generation equipment manufacturing industry (boiler, steam turbine, power station auxiliary), general equipment manufacturing industry (fan, compressor, pump, valve, cooling machine, air separation equipment, vacuum equipment, separation equipment, plastic machinery, etc.) design and development planning, basic construction and technical transformation projects and instrument manufacturing industry, and undertake the design task related to the production of special equipment, automatic line test device, making contribution to the establishment of the system of China's machinery industry.
  Power generation equipment, Chinese United counterpart service general equipment and other industries are major national technology and equipment with large, heavy load and high speed, high pressure, high temperature, high precision, high torque, high impact performance and characteristics. Casting, forging, for major components of blank finishing, large steel structure, container welding, heat treatment, test device of thick wall parts and fittings required for nondestructive testing, is the key to ensure the performance and quality of the products, is an important problem to be solved in engineering design and construction. For decades, the United China adhere to the analysis of the technology of key technology, the use of advanced technology and equipment, development of special test equipment and special equipment development, such as steam turbine, gas turbine, compressor, turbine pump, valves and other large machinery, machine testing device, large heat treatment device, large parts of welding equipment. In the aspect of solving hundreds of tons of heavy plant crane lifting capacity, super large equipment base, special structure design and corresponding utilities and other special technical problems to overcome many difficulties, reached the international advanced level.

Main Awards


Department of Industrial Engineering: 0571-88151971
No.1 Industrial Engineering Design Institute
General Administration Office: 88155027/88155023(FAX)
Production Process Unit 88151870/1896/5024/1867
Office of the Chief Senior Engineer: 88151867/1870/5024
Office of Master Plan & Technological-Economic Budgets: 88155024
Architecture Unit 88155028
Structure Unit 88151878
Unit of Public Works 88151890


No.2 Industrial Engineering Design Institute
General Administration Office: 88151863/88155684(FAX)
Office of Marketing  88155750
Office of Chief Senior Engineer  88151865/81185269
Production Process Unit  88155672/81185267/5268
Office of Master Plan 88151872
Office of Technological-Economic Budgets  81185267
Architecture Unit   88155659/5660/81185265/5266
Structure Unit  88151889/5030/5735/81185270
Public Works Unit - Division of Water Supply & Drainage    88151875
Public Works Unit - Division of Electrics
Public Works Unit - Division of Heating & Ventilation


No.3 Industrial Engineering Design Institute
General Administration Office: 88151891(TEL&FAX)
Production Process Unit  88155026/5734
Architecture Unit  88151879
Structure Unit   88155025
Public Works Unit  88151892
Industrial & Logistics Engineering Design Institute
General Administration Office  88151888/81185408/81185458(FAX)
Office of Chief Senior Engineer  88151866
Production Process Unit  88151869/81185254/5255/5256
Logistics & Commercial Engineering Unit  88155736
Office of Master Plan   81185259
Office of Logistics & Automation Equipment
Architecture Unit  88153196/1953/81185250/5251
Structure Unit  88151877/5032/ 81185248/5249
Public Works Unit - Division of Heating & Ventilation   81185253
Public Works Unit - Division of Electrics   81185252/88151874
Public Works Unit - Division of Water Supply & Drainage


Beijing Design Institute  88153191/88151986 (FAX)
Anhui Design Institute  88155675 (FAX)

Site Map|Contact Information

Zhe ICP No.19043761-1   Copyright © 2016 www.chinacuc.com All Rights Reserved.